What to check at your final walkthrough

A practical checklist before you sign off on the finished building.

Rachel Price

Rachel Price

Permits Manager

a kitchen with a table and chairs next to a window

Bring the right documents

Have the drawings, the material schedule and the contract with you. Compare what was built with what was agreed, room by room.

The checklist

  • Doors and windows open, close and lock properly

  • No cracks, stains or gaps in finishes

  • Every outlet, switch and fixture works

  • Plumbing has no leaks and good water pressure

  • HVAC heats and cools every room

Sign off with a punch list

Write down every item that needs fixing and agree on a date. Retainage is released only after the punch list is closed.