Warehouses, logistics hubs and production plants with heavy floors, long spans and tight lease deadlines.

(01) Scope
What’s
included
01
Site and civil
Grading, utilities, truck yards and stormwater.
02
Foundations and slabs
Heavy-duty, superflat slabs and equipment pads.
03
Steel or tilt-up shell
Long-span steel frames or tilt-up concrete panels.
04
Roof and envelope
Insulated panels, roofing, skylights and dock doors.
05
Process systems
Power distribution, compressed air, crane rails and sprinklers.
06
Commissioning
Testing, inspections and handover with as-built drawings.
(02) Phases and timing
About 9–15 months
01
Design and permits
1–3 months
02
Site and foundations
2–3 months
03
Steel shell
3–4 months
04
Roof and systems
2–3 months
05
Commissioning
1–2 months
Typical schedule for a 150,000 sq ft warehouse. Your exact timeline comes with the estimate.
(03) Pricing
Per sq ft
Indicative ranges. The final price is fixed in the contract after the site visit and design.
Shell
$85
/ sq ft
Slab, steel frame, roof and walls.
Operational
$130
/ sq ft
Shell plus docks, lighting, sprinklers and HVAC.
Process-ready
$190
/ sq ft
Full process systems, crane rails and offices.
What affects the price:
Clear height
Slab loads
Number of docks
Process systems
Timeline
Questions
Can you meet our lease deadline?
−
Yes. We plan the whole build backwards from your lease date and report progress against it every week.