[ General contractor ]

39.7392° N — 104.9903° W · Denver

Est. 2012

We build.
We deliver
on time.

Residential, commercial and industrial buildings — from design to handover. Fixed price and fixed deadline in every contract.

Structa crew on a construction site

Riverside Residence

186,000 sq ft

Delivered · 2023

  • Residential

  • ✦

  • Commercial

  • ✦

  • Industrial

  • ✦

  • Renovation

  • ✦

  • Design

  • ✦

  • General contracting

  • ✦

  • Residential

  • ✦

  • Commercial

  • ✦

  • Industrial

  • ✦

  • Renovation

  • ✦

  • Design

  • ✦

  • General contracting

  • ✦

(01) Company

Since 2012 we have been building homes, offices and industrial facilities across four states. Our own equipment fleet, our own crews and technical supervision at every stage — so the schedule and the budget never stay on paper only.

14

years on the market

180+

projects delivered

4.5M

sq ft built

120

specialists on staff

How we
work

Five steps from first call to handing over the keys. Every step closes with a signed document.

01

Request

A short call about building type, area and timeline.

1 day

02

Site visit

An engineer visits the site and assesses its condition.

2–3 days

03

Estimate

A detailed breakdown of works and materials.

5–7 days

04

Contract

Price, schedule, payment milestones and delay penalties are locked in.

1 day

05

Handover

Construction, site supervision and a formal handover.

Per schedule

Why
clients
choose us

/01

Fixed price

The contract price does not change during construction.

/02

Deadline guarantee

Delay penalties are written into every contract.

/03

Own machinery

40+ units of our own equipment — no waiting on rentals.

/04

5-year warranty

Written warranty on structure and building systems.

(04) Clients

“They handed over the building two weeks ahead of schedule and within the original budget. We are already planning the second phase together.”

Ryan Mitchell

Ryan Mitchell

Owner’s Representative, Riverbend Living · Riverside Residence

RIVERBEND

Northline

CEDAR & CO.

Alpine Retail

FRONT RANGE

Meridian

Frequently
asked

How much does construction cost per square foot?

−

It depends on the building type, number of stories and finish level. Indicative range: $120–500 per sq ft. You get an exact figure in the estimate after the site visit.

Can the price change during construction?

+

How are payments structured?

+

What warranty do you offer?

+

Can you start without drawings?

+

(05) Estimate

Tell us
about your
project.

An engineer will call you within one business day to schedule a site visit. The preliminary estimate is free.

1200 Larimer Street, Denver, CO 80204

Create a free website with Framer, the website builder loved by startups, designers and agencies.