What’s inside a construction estimate

What each line actually means, and where hidden costs usually hide.

Daniel Moore

Daniel Moore

Head of Estimating

brown pencil on white printing paper

How an estimate is structured

An estimate is the foundation of your contract price. It is usually split into sections: site preparation, groundworks, frame, roof, building systems, finishing and landscaping. Each section lists the volume of work, the unit price and the total.

A good estimate reads like a map of the project. If you can’t tell from it what will be built and in what order, ask for a more detailed breakdown before you sign anything.

Labor and materials

A reliable estimate shows labor and materials as separate lines. That way, if you switch to a different tile or window brand, you immediately see how the price changes, and nobody can quietly move costs between the two.

“An estimate that lumps labor and materials into one line is the easiest place for the price to grow later.”

Costs that often go missing

These items are frequently left out of the first estimate:

  • Geotechnical report and plan review fees

  • Utility hookups and tap fees

  • Construction waste removal

  • Temporary power and water on site

  • Equipment rental and delivery

A quick checklist

  1. Are labor and materials priced separately?

  2. Are material brands and grades specified?

  3. Is the price stated as fixed in the contract?

  4. Who pays for the five items listed above?