Union Tower

In progress

Residential

Construction cranes tower over unfinished buildings at dusk

Client

Union Development Group

Location

Denver, CO

Area

300,000 sq ft

Floors

22

Duration

30 months

Scope

General contracting

/01

Challenge

A 22-story tower on a corner lot with two live streets, a light-rail line and no space for laydown.

/02

Solution

Jump-form concrete core, just-in-time deliveries scheduled at night and a tower crane mounted inside the building footprint.

/03

Result

The structure topped out three weeks early. Interior work is now running floor by floor toward a 2026 opening.

Gallery

Before · During · After

a group of men standing on top of a construction site
white and blue concrete building under blue sky during daytime
a living room with a couch and a table
a living room filled with furniture and a kitchen

Client feedback

“The site team runs this tower like a clock. Our lenders have stopped asking for extra status meetings.”

Marcus Lee

Project Executive, Union Development Group

Planning