Ironworks Fabrication Hall

In progress

Industrial

Steel beams forming the roof structure of a building against a bright sky

Client

Ironworks Fabrication

Location

Greeley, CO

Area

96,000 sq ft

Floors

1

Duration

12 months

Scope

Design-build

/01

Challenge

A long-span steel hall for metal fabrication with a column-free floor and two 10-ton cranes.

/02

Solution

Pre-engineered long-span frames, crane girders fabricated in parallel and a phased slab pour.

/03

Result

The steel frame is up and the roof is closing in. Completion is planned for summer 2026.

Gallery

Before · During · After

a group of construction workers standing around a construction site
Interior of an abandoned industrial warehouse with exposed beams
Steel beams forming the roof structure of a building against a bright sky
gray concrete flooring

Client feedback

“They understood our workflow before they drew a single line. The hall fits our process exactly.”

Carlos Mendez

Owner, Ironworks Fabrication