Ironworks Fabrication Hall
In progress
Industrial

Client
Ironworks Fabrication
Location
Greeley, CO
Area
96,000 sq ft
Floors
1
Duration
12 months
Scope
Design-build
/01
Challenge
A long-span steel hall for metal fabrication with a column-free floor and two 10-ton cranes.
/02
Solution
Pre-engineered long-span frames, crane girders fabricated in parallel and a phased slab pour.
/03
Result
The steel frame is up and the roof is closing in. Completion is planned for summer 2026.
Gallery
Before · During · After




Client feedback
“They understood our workflow before they drew a single line. The hall fits our process exactly.”
Carlos Mendez
Owner, Ironworks Fabrication